Solar panels in Shiney Row and Penshaw.
Twelve panels here make about 6,100 kWh a year for £6,360 installed, designed on a free 30-minute video call.
Get my free quote
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
or call 07782 219224
- Free 30-minute video design call
- Priced before anyone visits
- Installed by our MCS-certified, fully insured teams
Shiney Row and Penshaw's solar year
Shiney Row and Penshaw's best month is May, at 124.5 kWh per kWp; December manages 28.9. Over the year that comes to 959 kWh per kWp, 3% above our Durham county estimate.
Generation per kWp, month by month
Show the monthly figures
| Month | kWh/kWp |
|---|---|
| January | 32.1 |
| February | 49.5 |
| March | 83.3 |
| April | 110 |
| May | 125 |
| June | 114 |
| July | 119 |
| August | 107 |
| September | 89.5 |
| October | 60.3 |
| November | 40.8 |
| December | 28.9 |
Source: PVGIS v5.2 (European Commission JRC), SARAH3 database, 1 kWp, 14% system loss, 35 degree pitch, due south, checked September 2026.
Against Great Britain as a whole: Shiney Row and Penshaw makes 959 kWh per kWp a year, and the mean of our 85 county PVGIS estimates (our GB average) is 925, so Shiney Row and Penshaw is 4% above it.
How Shiney Row and Penshaw compares
Small towns rarely get published solar figures, so here are the numbers for Shiney Row and Penshaw. It is one of 35 Durham towns we track, and it ranks 8th of 35 for solar yield, a town of 15,068 people in the House of Commons Library settlement data. PVGIS gives its roofs 959 kWh per kWp a year, 2.63 peak sun hours a day averaged across the seasons, and the standard 12 panel model turns that into £867 of year one benefit, £247 of it from your own generation and £620 from export at 12p.
Treat these as calibration rather than a quote. The calculator below runs the same model, opened on Shiney Row and Penshaw's own yield, and prices a 12 panel system at £6,360 installed before any battery. Your free design call reworks every number for your actual roof, its shading and your usage.
Sunderland is the planning authority covering Shiney Row and Penshaw, which the House of Commons Library classes as a small town.
The charger is in the installed price but left out of payback: charging savings depend on your mileage and tariff, which the design call models properly.
Your real roof and usage, worked through on a free 30-minute video call. Use the full form or leave three details below.
Price this for your roof
Three details. We call or text within one working day to book your free 30-minute design call, on video or by phone if you prefer.
Modelled for Shiney Row and Penshaw at 54.86815, -1.49212 on PVGIS data, with imports valued at 26.32p/kWh and solar at £1,000 per kWp installed. Sources and assumptions: help page.
Who runs the grid in Shiney Row and Penshaw
Shiney Row and Penshaw sits in Northern Powergrid's North East England licence area, so Northern Powergrid is the network operator (DNO) any solar panels or battery here are registered with.
Below 3.68kW per phase of inverter and battery output, the G98 route applies: the installation is notified to Northern Powergrid within 28 days of commissioning, with no prior approval.
A bigger inverter or battery output needs a G99 application in advance. Northern Powergrid publishes a guaranteed standard of 45 working days to quote for a low voltage generation connection.
Sources: NESO DNO licence areas (3 May 2024); Northern Powergrid, generation connections page, checked 25 September 2026. G98 vs G99, explained.

Heat pumps and EV charging in Shiney Row and Penshaw
A heat pump in Shiney Row and Penshaw
A heat pump does most of its work from November to February. Over those four months, 12 panels in Shiney Row and Penshaw make about 960 kWh, against 2,950 kWh from May to August, so winter heating runs mostly on grid electricity and the tariff matters more than the roof.
The Boiler Upgrade Scheme, open in England and Wales, takes £7,500 off an air source or ground source heat pump, or £2,500 off an air-to-air unit. Homes on oil or LPG with no mains gas get £1,500 more until March 2027 (gov.uk, checked 28 September 2026).
Charging an EV in Shiney Row and Penshaw
A 12-panel roof in Shiney Row and Penshaw makes about 790 kWh in May. A typical home uses around 70 kWh of that in daylight (the calculator's typical-use settings), which leaves most of the month's output for an EV or for export.
The calculator above includes a 7.4kW smart charger from £1,100 installed. Renters and flat owners with off-street parking can claim 75% of a chargepoint's cost, up to £500 per socket, until 31 March 2027 (gov.uk, checked 28 September 2026).
Installed prices, the same in every town
Every system is designed around your roof on the free call before anything is fitted.
Solar panel servicing and repair in Shiney Row and Penshaw
Faults, servicing and ageing inverters follow the same economics in Shiney Row and Penshaw as anywhere else, and the guides below price them plainly.
Shiney Row and Penshaw solar questions
What does a solar panel system produce in Shiney Row and Penshaw?
Each kWp of panels in Shiney Row and Penshaw makes 959 kWh a year on PVGIS figures, so a typical 12-panel system produces around 6,100 kWh, from about 180 kWh in December up to 790 kWh in May.
What would 12 solar panels cost in Shiney Row and Penshaw?
£6,360 for 12 panels (6.36 kWp), the same as in every other place we cover, because solar is priced at £1,000 per kWp installed rather than by area. A battery adds its own installed price on top. Where Shiney Row and Penshaw differs is output: about 6,100 kWh a year from that system.
Would a system in Shiney Row and Penshaw need approval from the network operator?
Shiney Row and Penshaw is on Northern Powergrid's network (North East England licence area). Systems up to 3.68kW per phase of inverter output follow G98: Northern Powergrid is notified within 28 days of commissioning, with no approval needed first. Anything larger needs a G99 application before installation. Northern Powergrid publishes a guaranteed standard of 45 working days to quote for a low voltage generation connection. Our G98 vs G99 guide explains both routes.
How much would export pay on a system in Shiney Row and Penshaw?
It is exported. With typical use and no battery, about 5,163 kWh of the 6,100 kWh a 12-panel system makes in Shiney Row and Penshaw goes to the grid, around £620 a year at 12p. A battery keeps more of it for the evening; the export rates table shows what suppliers pay.
Is solar worth it in Shiney Row and Penshaw in winter?
It works, but the year is lopsided. 69% of a Shiney Row and Penshaw roof's output lands between April and September; the four months from November to February give about 960 kWh on a 12-panel system. Payback is worked out on the whole year, not the winter.
How Shiney Row and Penshaw compares with its neighbours
How the towns nearest Shiney Row and Penshaw compare on the same PVGIS settings, closest first.
| Town | kWh per kWp a year | vs Shiney Row and Penshaw |
|---|---|---|
| Shiney Row and Penshaw | 959 | this town |
| Fence Houses | 948 | −11 kWh |
| Houghton-le-Spring | 953 | −6 kWh |
| Washington | 952 | −7 kWh |
| Chester-le-Street | 936 | −23 kWh |
| Hetton-le-Hole | 952 | −7 kWh |
| Birtley | 944 | −15 kWh |
PVGIS v5.2 for each town centroid, identical assumptions throughout. A few kWh either way is weather-year noise; a spread beyond about 30 kWh per kWp is real geography.
Also for Shiney Row and Penshaw: Solar panels in Shiney Row and Penshaw from OVO Solar & Battery
Also near Shiney Row and Penshaw
See a number before you speak to anyone
Answer a few questions about your roof and usage and see an instant solar and battery estimate. No email needed to see the result.
Reading for Shiney Row and Penshaw homeowners
Sourced, dated and written by us. The same ground we cover on your free call.
How to size a solar and battery system, properly
Usage, storage, connection, array. Four decisions, and the order between them matters.
Read the guide →GivEnergy in administration: what owners should do now
The sourced timeline, the warranty position, and the owner's checklist for this month.
Read the guide →Smart charge point regulations, explained
Why your charger arrives pre-set to charge overnight, and why it waits before it starts.
Read the guide →What are the disadvantages of a heat pump? Six honest ones
Six real disadvantages, worth planning around rather than a reason to rule one out.
Read the guide →Why tariff choice moves payback more than kit choice
Identical kit, five times the export income. The tariff decision worked through with August 2026 rates.
Read the guide →What MCS certification actually is, and why your export payments depend on it
The badge that decides whether your solar earns export payments. It cannot be added later.
Read the guide →Get my free quote
Takes about two minutes. We call or text within one working day to book your free 30-minute video design call at a time that suits you. We design it around your roof and your numbers, and our MCS-certified, fully insured installation teams install it.